After the foreign customer's product order is confirmed, after 30 days of production, installation,
And pass the inspection, the container will be loaded and shipped to South America customer.
Video showing the container installation process.
After the commissioning and inspection of the machine is completed, the next step is the process of disassembly,
loading and unloading, transportation and delivery. Delivery mainly includes the following aspects:
1. Disassemble the machine first, disassemble and install the installed equipment according to the requirements of
the cabinet, and make connection marks on the corresponding connection parts.
2. Then wrap the plastic film according to the disassembly of each part;
3. After the container and forklift arrive, load all parts of the machine;
4. After all parts of the machine are loaded into the container, each piece of goods needs to be fixedly bundled;
5. Check to ensure that all parts are firmly fixed;
6. Finally, carry out the container sealing operation.
contact US
GET IN TOUCH WITH US
The first thing we do is meeting with our clients and talk through their goals on a future project.
During this meeting, feel free to communicate your ideas and ask lots of questions.
They are all manufactured according to the strictest international standards. Our products have received favor from both domestic and foreign markets.
They are now widely exporting to 200 countries.