Goose type footwear injection molding machine is mainly composed of goose head assembly, turntable assembly, rack assembly and other parts. Other parts are packed in the rack assembly during transportation.
Before the installation of the machine, the components shall be disassembled and counted, and then the installation shall be implemented step by step according to the installation video on the website. The video is divided into 18 steps, starting from 01-18.
Applicable to all models with goose head component connection.
This video is step 17.
Details
WhatsApp:+8618965705158
Email: wenkie@soncmachine.com
Feed and injection test:
Now we are going to perform prediction and injection tests on the slipper making machine, mainly according to the following steps:
1. Add the required raw materials into the hopper;
2. Toggle the temperature controller switch to start the screw heating;
3. Set the required temperature of the four sections of the screw;
4. Wait for the temperature of each section of the screw to be heated to the set temperature;
5. Turn the anticipate/injection knob to anticipate, the screw rotates, and the raw materials in the hopper drop into the barrel;
6. Turn the anticipating/injection knob to inject, the screw moves along the direction of the barrel, and the raw materials are ejected from the injection head.
contact US
GET IN TOUCH WITH US
The first thing we do is meeting with our clients and talk through their goals on a future project.
During this meeting, feel free to communicate your ideas and ask lots of questions.
They are all manufactured according to the strictest international standards. Our products have received favor from both domestic and foreign markets.
They are now widely exporting to 200 countries.