Goose type footwear injection molding machine is mainly composed of goose head assembly, turntable assembly, rack assembly and other parts. Other parts are packed in the rack assembly during transportation.
Before the installation of the machine, the components shall be disassembled and counted, and then the installation shall be implemented step by step according to the installation video on the website. The video is divided into 18 steps, starting from 01-18.
Applicable to all models with goose head component connection.
This video is step 16.
Details:
WhatsApp:+8618965705158
Email: wenkie@soncmachine.com
Machine running test:
Next, we will test the operation of the footwear injection molding machine. Here, we mainly test the mold opening/closing, rotary table and prying device. The main steps are as follows:
1. Turn on the motor power supply, and the power indicator lights up;
2. When turning on the power supply of the motor for the first time, turn it on slightly to check whether the rotation direction of the motor is correct;
3. Select the test station on the touch screen;
4. Toggle the rotary table rotation button, and when turning to the selected station, release the rotary table rotation button;
5. Toggle the mold closing button, and after a period of fast mold closing, it will turn to the slow mold closing state;
6. Toggle the mold pushing knob to withdraw the mold from the mold closing cylinder;
7. Toggle the prying button, and the prying device shall start to open the upper cover of the mold;
8. The skid button resets, the skid cylinder returns, and the upper cover of the mold is closed.
contact US
GET IN TOUCH WITH US
The first thing we do is meeting with our clients and talk through their goals on a future project.
During this meeting, feel free to communicate your ideas and ask lots of questions.
They are all manufactured according to the strictest international standards. Our products have received favor from both domestic and foreign markets.
They are now widely exporting to 200 countries.