Goose type footwear injection molding machine is mainly composed of goose head assembly, turntable assembly, rack assembly and other parts. Other parts are packed in the rack assembly during transportation.
Before the installation of the machine, the components shall be disassembled and counted, and then the installation shall be implemented step by step according to the installation video on the website. The video is divided into 18 steps, starting from 01-18.
Applicable to all models with goose head component connection
This video is step 15.
Details:
WhatsApp:+8618965705158
Email: wenkie@soncmachine.com
Test fan and blowing:
When the power supply is turned on, we need to test whether the fan wiring is correct, and whether the blowing and venting functions are normal, mainly according to the following steps:
1. Turn on the main fan switch in the electric control cabinet;
2. Put a handkerchief or gauze at the fan outlet;
3. Check whether the fan is blowing or suction, and the blowing is normal;
4. For air suction, the three-phase circuit of the fan needs to be adjusted;
5. Toggle the air blowing knob on the operation panel;
6. When the air blowing valve is turned on, there will be air blowing sound or air pressure at the injection port of the mold;
7. If no gas is blown out, the cause shall be checked.
contact US
GET IN TOUCH WITH US
The first thing we do is meeting with our clients and talk through their goals on a future project.
During this meeting, feel free to communicate your ideas and ask lots of questions.
They are all manufactured according to the strictest international standards. Our products have received favor from both domestic and foreign markets.
They are now widely exporting to 200 countries.