Goose type footwear injection molding machine is mainly composed of goose head assembly, turntable assembly, rack assembly and other parts. Other parts are packed in the rack assembly during transportation.
Before the installation of the machine, the components shall be disassembled and counted, and then the installation shall be implemented step by step according to the installation video on the website. The video is divided into 18 steps, starting from 01-18.
Applicable to all models with goose head component connection
This video is step 14.
Details:
WhatsApp:+8618965705158
Email: wenkie@soncmachine.com
Turn on machine power:
Now we need to turn on the power of the sole making machine, which mainly includes the following steps:
1. Turn on the main power switch in the electric control cabinet;
2. Turn on the temperature control power switch;
3. Open the control switch of other electrical appliances and close the electric cabinet door;
4. Turn on the power switch on the operation panel, and the power indicator is on;
5. Turn on the temperature controller knob on the operation panel to start the temperature controller.
contact US
GET IN TOUCH WITH US
The first thing we do is meeting with our clients and talk through their goals on a future project.
During this meeting, feel free to communicate your ideas and ask lots of questions.
They are all manufactured according to the strictest international standards. Our products have received favor from both domestic and foreign markets.
They are now widely exporting to 200 countries.