Goose type footwear injection molding machine is mainly composed of goose head assembly, turntable assembly, rack assembly and other parts. Other parts are packed in the rack assembly during transportation.
Before the installation of the machine, the components shall be disassembled and counted, and then the installation shall be implemented step by step according to the installation video on the website. The video is divided into 18 steps, starting from 01-18.
Applicable to all models with goose head component connection.
This video is step 08.
Details:
WhatsApp:+8618965705158
Email: wenkie@soncmachine.com
install hydraulic hose:
The hydraulic pipe in the sole injection machine is mainly used to support the flow of hydraulic oil, so that the hydraulic oil can flow from the pressure source oil pump port to each moving part. For the goose slipper production machine, when the parts are disassembled, part of the hydraulic pipes should also be disassembled and reconnected during installation:
The installation process is divided into the following steps:
1. Check the number of hydraulic pipes of each part after disassembly;
2. Reconnect the hydraulic pipes with the same number with a wrench, and ensure that the connection is tight;
3. When connecting, check whether the hydraulic pipe interface is bruised or scratched;
4. If there is scratch or bruise, replace the hydraulic oil pipe;
5. When the sandal production machine is started, observe whether there is hydraulic oil leakage at the connection.
contact US
GET IN TOUCH WITH US
The first thing we do is meeting with our clients and talk through their goals on a future project.
During this meeting, feel free to communicate your ideas and ask lots of questions.
They are all manufactured according to the strictest international standards. Our products have received favor from both domestic and foreign markets.
They are now widely exporting to 200 countries.