Goose type footwear injection molding machine is mainly composed of goose head assembly, turntable assembly, rack assembly and other parts. Other parts are packed in the rack assembly during transportation.
Before the installation of the machine, the components shall be disassembled and counted, and then the installation shall be implemented step by step according to the installation video on the website. The video is divided into 18 steps, starting from 01-18.
Applicable to all models with goose head component connection.
This video is step 03.
Details:
WhatsApp:+8618965705158
Email: wenkie@soncmachine.com
install center frame:
Next, we will install the central frame in the following steps:
First, install the foundation of the central frame; Secondly, the central frame is connected with the host part, and screws or pins are installed; Finally, the horizontal adjustment of the central frame.
matters needing attention:
1. The tools for horizontal adjustment of the central frame are transparent water pipes and adjustable wrenches;
2. The level adjustment can only be completed with the cooperation of two people. Each person is responsible for the water level observation and screw adjustment at one end.
contact US
GET IN TOUCH WITH US
The first thing we do is meeting with our clients and talk through their goals on a future project.
During this meeting, feel free to communicate your ideas and ask lots of questions.
They are all manufactured according to the strictest international standards. Our products have received favor from both domestic and foreign markets.
They are now widely exporting to 200 countries.