SERVICE
VR

adjust the level of machine:

After the shoes injection molding machine is installed on the ground, the next step is to adjust the level of the machine. The horizontal adjustment of the machine is realized by adjusting the anchor thread. Before adjustment, prepare the level gauge and adjustable wrench. When there are many anchors, select the adjusted anchor screws (no more than 4), and the floor area of the selected anchor is the largest; Place the level on the upper surface of the formwork pier, observe the water position of the level and adjust the corresponding anchor screw, and adjust the lower one to the higher one and the higher one to the lower one; The level gauge needs to be placed crosswise in both horizontal and vertical directions, and the machine can be leveled in two different directions; Finally, screw other foundation screws into the top tight foundation plate to play a supporting role.

Basic Information
  • Year Established
    --
  • Business Type
    --
  • Country / Region
    --
  • Main Industry
    --
  • Main Products
    --
  • Enterprise Legal Person
    --
  • Total Employees
    --
  • Annual Output Value
    --
  • Export Market
    --
  • Cooperated Customers
    --

contact US

GET IN TOUCH WITH US

The first thing we do is meeting with our clients and talk through their goals on a future project.
During this meeting, feel free to communicate your ideas and ask lots of questions.

Recommended

They are all manufactured according to the strictest international standards. Our products have received favor from both domestic and foreign markets.
They are now widely exporting to 200 countries.

Send your inquiry

Choose a different language
English
हिन्दी
Tiếng Việt
italiano
français
русский
Português
Español
العربية
Current language:English